London Biggin Hill – New RNAV (GNSS) Approach Procedure for runway 21

Consultation:  15 April 2021 - 7 May 2021. London Biggin Hill Airport is proposing to implement an RNAV (GNSS) Instrument Approach Procedure (IAP), with LNAV and LPV Minima, to Runway 21. In accordance with the CAA guidance in CAP1616, the sponsor of an Airspace Change must test the Comprehensive List of options with the [...]

2021-04-15T11:36:43+00:0015-Apr-2021|Past Consultations|

Temporary Danger Area at Goodwood aerodrome.

Consultation:  23 December 2020 - 15 January 2021. This consultation is about a project that intends to gradually demonstrate that UAV Beyond Visual Line of Sight (BVLoS) operations in non-segregated airspace are safe, can meet with regulatory approval, and integrate seamlessly with manned aviation, whilst still providing safe and efficient access to the airspace by [...]

2021-01-25T21:43:56+00:0014-Dec-2020|Past Consultations|

Snowdonia Aerospace Centre Danger Area Airspace Change Proposal

Consultation: 7 December 2020 - 22 January 2021. The aim of this consultation is to seek the views on the introduction of a change in designation of airspace at and around the Snowdonia Aerospace Centre at Llanbedr Aerodrome, which is being used for research, development, test and evaluation (RDT&E) of drones, electric aircraft, urban/regional air [...]

2021-01-25T21:45:42+00:0008-Dec-2020|Past Consultations|

Economic regulation of NATS En Route plc: Consultation on the approach to the next price control review

Consultation:  2 December 2020 - 12 January 2021.This consultation is on the approach to the next price control review for NATS (En Route) plc (NERL) in light of the impact of the Covid-19 pandemic. Following CAA´s previous decisions on NERL’s price control in 2019 and subsequent reference to the Competition and Market Authority’s (CMA), the [...]

2021-01-25T21:43:45+00:0004-Dec-2020|Past Consultations|

Removal of London Stansted LYD6R/5S SIDs

Consultation:  30 November 2020 - 14 December 2020.NATS is proposing that ATS route M604 is extended from DET VOR to LYD VOR. This would replace the final segment of the Stansted LYD 6R/5S Standard Instrument Departures (SIDs), and hence would allow the removal of these SIDs. This change is necessary to remove the dependency on [...]

2021-01-25T21:43:36+00:0004-Dec-2020|Past Consultations|

Introduction of a new Transponder Mandatory Zone in the Moray Firth.

Consultation:  9 November 2020 - 17 January 2021. Moray Offshore Wind Farm Ltd. intends to develop a new offshore wind farm in the Moray Firth, that will contain up to 85 Wind Turbine Generators. Wind turbines could interfere with air traffic control radars. To mitigate against this interference, they are proposing to use RAG [...]

2021-01-25T21:43:23+00:0009-Nov-2020|Past Consultations|

London Biggin Hill – New RNAV (GNSS) Approach Procedure for runway 21

Consultation:  26 October 2020 - 13 November 2020. London Biggin Hill Airport is proposing to implement an RNAV (GNSS) Instrument Approach Procedure (IAP), with LNAV and LPV Minima, to Runway 21, that will not only act as a back-up in the event of an ILS failure, but will also future proof the airfield and [...]

2021-01-25T21:43:17+00:0026-Oct-2020|Past Consultations|

RMZ and TMZ- Consultation on revised SARG Airspace Policy Statement

Consultation:  26 October 2020 - 18 December 2020.As part of their work to enable the Airspace Modernisation Strategy (CAP 1711), the CAA has reviewed and drafted an amendment to the Airspace Policy Statement on Radio Mandatory Zones (RMZ) and Transponder Mandatory Zones (TMZ). The CAA now seeks to obtain the views of the members of [...]

2021-01-25T21:43:04+00:0026-Oct-2020|Past Consultations|

Temporary airspace change in the Sout West

Consultation: 17 July 2020 - 16 October 2020. Aquila has made an application to the CAA for a Temporary Airspace Change in the vicinity of the Plymouth and Portland Exercise / Danger Areas to ensure operational maritime and aviation training conducted in the Exercise Areas can continue safely whilst the legacy ATC equipment is [...]

2020-10-21T09:39:04+00:0017-Jul-2020|Past Consultations|

Future Combat Airspace (FCA) trial

Consultation: 14 July 2020 - 24 July 2020. The MoD has identified a requirement for the generation of new, suitable and safe airspace in the UK to facilitate large scale exercises, allowing for modern military aircraft and systems to train to their full capabilities. The current existing airspace structures do not provide the MoD [...]

2020-10-21T09:40:05+00:0014-Jul-2020|Past Consultations|